Utilities are readily available at Gateway West Commerce Park and include: low cost, reliable electrical service, abundant water and sewer capabilities, affordable natural gas, and redundant fiber.
UTILITY INFORMATION | ||
Utility | Provider | Description |
Electric | Duke Energy | - 100kV electric transmission power line in the area - 12.5kV 3 phase power line on the site |
Electric | Town of Forest City | Electrical infrastructure is available at site providing opportunities for customer choice |
Water | Town of Forest City | - 16” water main on Daniel Road - Permitted Capacity of 8MGD - Total available capacity of 4.38MGD |
Sewer | Town of Forest City | - 10” sanitary sewer line along northern boundary of property with 270GPM capacity |
Natural Gas | PSNC | - 6” high pressure line - Approximately 350 psi |
Telecom | AT&T | |
Fiber | AT&T and PANGAEA |
- AT&T: T-1 and Ethernet (Fiber) - PANGAEA: redundant fiber connections are provided by dual routing from Charlotte and Atlanta with connectivity that is equivalent to that of most metropolitan areas |
Fire Protection | Town of Forest City | 2.3 miles / 4 minutes from the site |
NOTE: Every effort has been made to ensure the accuracy of the above information, however it should be independently verified.